This information is a reference for vendors and for the general public to find out about current business opportunities with LCCC. For information on any vendor relationship with LCCC, or to participate in quote, bid or proposal processes, please contact Procurement & Contracting.

Current Vendor Opportunities

Below is a list of quote, bid and proposal opportunities currently available with LCCC. A person interested in any of these can contact the Procurement & Contracting Office to obtain copies of the appropriate quote, bid or proposal package. 
 
Quote/Bid/
Proposal Reference #
Documents Title or Description Pre-Bid or Pre-Proposal Meeting or Tour Document Due Date Awarded To

RFP-17229

Request for Proposal - Boiler Burner Replacement

A mandatory pre-bid meeting will be held on June 6, 2017 at 10 a.m. in the Plant Operations Building, Room PO-106 (map included in documents).
  • Questions due, via email, no later than June 13, 2017 to jspezzano@lccc.wy.edu.
  • Bid due date: June 27, 2017 at 4:00 p.m. 
 

PQF-17232

Pre-qualification Request for Engineering Services

 
  • Questions due, via email, no later than May 31, 2017 to jspezzano@lccc.wy.edu.
  • Response due date: June 13, 2017 at 3:00 p.m.
 

IFB-17193 

McIlvaine Plaza

A mandatory pre-bid meeting will be held on May 4, 2017 at 10 a.m. in the College Community Center CCC-178 (map included in documents).
  • Questions due, via email, no later than May 9, 2017 to jspezzano@lccc.wy.edu.
    • Bid due date: May 16, 2017 at 3:00 p.m. to Administration AM-104.
Reiman Corp

IFB-17188

LCCC Interior lighting replacement Phase 3

A mandatory pre-bid meeting will be held on April 27, 2017 at 10 a.m. in the Plant Operations Conference Room 106.
  • Questions due, via email, no later than May 4, 2017 to jspezzano@lccc.wy.edu.
    • Bid due date: May 10, 2017 at 3:00 p.m.
Pole Mountain Electric

RFB-17181

As-needs Minor Construction

 
  • Bid sheets, price sheets, and references are due by April 27, 2017 at 4:00 p.m. to jspezzano@lccc.wy.edu.
 

IFB-17176

LCCC Science Lab Renovation

This is partially federally funded meaning the Davis-Bacon Act applies to this project.

A mandatory pre-bid meeting will be held on April 13, 2017 at 10 a.m. in the Science Center SC-158 (map included in documents).
  • Questions due, via email, no later than April 19, 2017 to jspezzano@lccc.wy.edu.
  • Sealed bid due date: April 25, 2017 at 3:00 p.m.
Construction Specialists Inc.

RFP-17167

Residence Hall Architectural Design

 
  • Questions due, via email, no later than March 31, 2017 at 4:00 p.m. to jspezzano@lccc.wy.edu.
  • Bid due date: April 18, 2017 at 4:00 p.m.
Method Studio

IFB-17169

LCCC Gas Meter Relocation

A mandatory pre-bid meeting will be held on April 5, 2017 at 10 a.m. in the College Community Center, Room 179 (map included in documents).
  • Questions due in writing no later than April 7, 2017 to jspezzano@lccc.wy.edu.
  • Bid due date: April 13, 2017 at 3:00 p.m.
Master Mechanical

RFQ-17155

Grounds Shed Re-Roof

Mandatory pre-bid meeting March 8, 2017 at 10:00 a.m. in Plant Operations, Room 106
  • Quotes due March 21, 2017
Gem City Roofing

IFB-17144

LCCC Albany County Campus Classroom Additions in Laramie, WY

A mandatory pre-bid meeting will be held on March 3, 2017 at the Albany County Campus (1125 Boulder Dr., Laramie, WY 82070) at 2:00 p.m..
  • Bid due date: March 15, 2017 at 4:00 p.m. in Administration (Cheyenne) AM-104
Bid Canceled

RFB-17146

As-needs Painting for the LCCC Residence Halls

 
  • Responses are due February 28, 2017 at 4:00 p.m.

via email to jspezzano@lccc.wy.edu

 

IFB-17138

ADA Shower Design for FlexTech Building

A mandatory pre-bid meeting will be held on February 16, 2017 at 10 a.m. in the College Community Center, Room 178.
  • Bid due date: March 1, 2017 at 4:00 p.m.

 

Construction Specialists

IFB-17122

LCCC Arena Water Main Reconstruction Project

A mandatory pre-bid meeting will be held on February 1, 2017 at 9 a.m. in the Plant Operations Conference Room.
  • Bid due date: February 16, 2017 at 4:00 p.m.

 

Aztec Construction

RFP-17120

Architect Design Firm

 
  • Questions due by January 26, 2017 by 4:00 p.m.
  • Bid due date: February 2, 2017 at 4:00 p.m.
Hord Coplan Macht: Bennett Wagner Grody; and Tobin & Assoc.

IFB-17116

South Irrigation System Rehabilitation Project

A mandatory pre-bid meeting will be held on January 4, 2017 at 10 a.m. in the CCC-179.

  • Questions due by January 5, 2017 by noon.
  • Bid due date: January 12, 2017 at 4:00 p.m.

via email to jspezzano@lccc.wy.edu

Reiman Corp

IFB-17111

Gateways for Secondary Entries

A mandatory pre-bid meeting will be held on January 10, 2017 at 10 a.m. in the Plant Operations conference room.

  • Questions due by January 17, 2017 by noon.
  • Bid due date: January 26, 2017 at 3:00 p.m.

via email to jspezzano@lccc.wy.edu

Reiman Corp

IFB-17076

Career & Technical (CT) and Auto Body (AB) Roof Replacement

mandatory pre-bid meeting will be held on December 8, 2016 at 10 a.m. in the Plant Operations conference room.

  • Questions due Dec. 12, 2016 by noon.
  • Pre-qualification statements are due Dec. 12, 2016.
  • Bids due Dec. 15, 2016 at 3 p.m. in the Administration and Finance Conference Room AM-104

via email to jspezzano@lccc.wy.edu

Big Horn Roofing

IFB-17066

Interior Lighting Replacement Phase 2

A mandatory pre-bid meeting will be held on November 1, 2016 at 10 a.m. in the Plant Operations conference room.

  • Questions are due Nov. 8, 2016.
  • Bids due on Nov. 15, 2016 by 4:00 p.m.

Quality Electric

Current Surplus for Sale

There are currently no items for sale.

Disclaimer

If a disparity occurs between this website and the bid documents, the bid documents will govern. The information stated on this website shall not be construed as an interpretation of the state statutes. In the event of changes in the laws, regulations or procedures, the laws, regulations and procedures are binding and take precedent.

This disclaimer is intended to prevent LCCC's web contents from being mistaken for official documents in the strict legal sense, even while the website is a reliable source of accurate information. It is not possible for LCCC to control all aspects of its presence on the Internet on an accountable basis, as in the case of outside sources linked to our pages. Neither LCCC nor the author assume any responsibility for the content of any page reached through a link displayed here.
RFP-17120